An Empty Unit in Oxfordshire. Here's What's in It Now.
Installation is still under way at our Oxford (Chalgrove) facility, adding WEEE processing capacity in the south of England.
An empty unit in Oxfordshire. Here's what's in it now.
Installation is still under way at our Oxford (Chalgrove) facility. There's still a pallet or two on the floor, but you can see the line now.

Capacity in the South of England
Oxford joins our Preston and Swindon sites and adds WEEE processing capacity in the south of England.
Talk to the Team
If you handle Low Grade WEEE or Mixed WEEE Plastics in Oxfordshire or the Thames Valley, now is a good time to talk. Get in touch here.
More News
ITADs: Struggling for Space? RORO Container Options for Low-Grade WEEE
Low-grade printers, monitors, PCs and mixed electricals that can't be resold still take up valuable floor space. 3R Technology Global is the downstream processor behind ITAD businesses, with RORO container options for larger volumes.
Meet Us at AMI Plastics World Expos North America, Booth R2719
Most people see e-waste plastic as the leftover. We see it as a material stream. Meet the 3R Technology Global team at Booth R2719 in Cleveland, November 11-12, 2026.
Two New Certificates on the Wall at Riverbank
3R Technology California has been certified to ISO 14001:2015 (environmental management) and ISO 45001:2018 (occupational health and safety) at our Riverbank, California facility.
