← Back to News
Operations··3R Technology Global

An Empty Unit in Oxfordshire. Here's What's in It Now.

Installation is still under way at our Oxford (Chalgrove) facility, adding WEEE processing capacity in the south of England.

An empty unit in Oxfordshire. Here's what's in it now.

Installation is still under way at our Oxford (Chalgrove) facility. There's still a pallet or two on the floor, but you can see the line now.

Recycling line installation under way at the Oxford (Chalgrove) facility

Capacity in the South of England

Oxford joins our Preston and Swindon sites and adds WEEE processing capacity in the south of England.

Talk to the Team

If you handle Low Grade WEEE or Mixed WEEE Plastics in Oxfordshire or the Thames Valley, now is a good time to talk. Get in touch here.

What's the hardest WEEE stream to find a home for right now?

We use cookies to protect our contact form (Cloudflare Turnstile — strictly necessary), measure site usage (Google Analytics 4 — optional), and display facility maps (Google Maps — optional). By clicking Accept, you consent to optional analytics and map cookies. Declining keeps strictly necessary cookies only and the rest of the site works fully. Cookie Policy · Privacy Policy