Part of a new processing line currently in build at our equipment supplier, ahead of installation at our Chalgrove site in Oxfordshire — the front end of recovery, where end-of-life electronics first get reduced to a workable stream.

A new shredder, taking shape on the factory floor — Oxford-bound.
This is part of a new processing line currently in build at our equipment supplier, ahead of installation at our Chalgrove site in Oxfordshire.
The Front End of Recovery
Heavy steel, a serious feed throat, and the hydraulics to drive it — this is the front end of recovery, where end-of-life electronics first get reduced to a workable stream before separation and material recovery begin.
It's a useful reminder that scaling up e-waste recovery isn't software. It's machinery — built, tested, and commissioned piece by piece before a single tonne moves through it.
We'll share more once it's installed and running in Oxford.
If you have e-waste to move in the South of England, get in touch.
More News
International E-Waste Day 2026: The Small Stuff Adds Up
Headlamps. Bluetooth keyboards. TV remotes. A toy laptop. One box. Small enough to forget about. That's the problem.
Meet Us at E-Scrap 2026 in New Orleans — Booth #320
3R Technology Global is at E-Scrap 2026, October 26-28 at the Hyatt Regency New Orleans — Booth #320. Got e-waste with nowhere to go? Let's talk.
Meet Us at E-Waste World Expo North America — Stand 325
3R Technology Global is exhibiting at E-Waste World Expo North America, October 28-29 at the Cobb Convention Center, Atlanta — Stand 325. Stop by, say hello and meet the team in person.
