Oxford Is Being Set Up. The Weighbridge Goes In First.
Good day to be installing a weighbridge. Oxford is our newest facility, currently being set up — and accurate weighing from day one means clean, transparent operations for every supplier from the start.
Good day to be installing a weighbridge.
This is Oxford — our newest facility, currently being set up.
Why the Weighbridge Goes In First
A weighbridge is one of the first things that goes in for a reason. Every load that arrives gets accurately weighed. Every supplier knows exactly what they're sending. No guesswork, no disputes — just clean, transparent operations from day one.
Growing UK Network
Oxford joins our growing network of processing facilities across the UK and US — alongside Preston, Swindon, and Riverbank, California.
If you have e-waste to move in the South of England — we'd love to hear from you.
More News
ITADs: Struggling for Space? RORO Container Options for Low-Grade WEEE
Low-grade printers, monitors, PCs and mixed electricals that can't be resold still take up valuable floor space. 3R Technology Global is the downstream processor behind ITAD businesses, with RORO container options for larger volumes.
Meet Us at AMI Plastics World Expos North America, Booth R2719
Most people see e-waste plastic as the leftover. We see it as a material stream. Meet the 3R Technology Global team at Booth R2719 in Cleveland, November 11-12, 2026.
Two New Certificates on the Wall at Riverbank
3R Technology California has been certified to ISO 14001:2015 (environmental management) and ISO 45001:2018 (occupational health and safety) at our Riverbank, California facility.
