Oxford Is Being Set Up. The Weighbridge Goes In First.
Good day to be installing a weighbridge. Oxford is our newest facility, currently being set up — and accurate weighing from day one means clean, transparent operations for every supplier from the start.
Good day to be installing a weighbridge.
This is Oxford — our newest facility, currently being set up.
Why the Weighbridge Goes In First
A weighbridge is one of the first things that goes in for a reason. Every load that arrives gets accurately weighed. Every supplier knows exactly what they're sending. No guesswork, no disputes — just clean, transparent operations from day one.
Growing UK Network
Oxford joins our growing network of processing facilities across the UK and US — alongside Preston, Swindon, and Riverbank, California.
If you have e-waste to move in the South of England — we'd love to hear from you.
More News
International E-Waste Day 2026: The Small Stuff Adds Up
Headlamps. Bluetooth keyboards. TV remotes. A toy laptop. One box. Small enough to forget about. That's the problem.
Meet Us at E-Scrap 2026 in New Orleans — Booth #320
3R Technology Global is at E-Scrap 2026, October 26-28 at the Hyatt Regency New Orleans — Booth #320. Got e-waste with nowhere to go? Let's talk.
Meet Us at E-Waste World Expo North America — Stand 325
3R Technology Global is exhibiting at E-Waste World Expo North America, October 28-29 at the Cobb Convention Center, Atlanta — Stand 325. Stop by, say hello and meet the team in person.
